Bathroom Remodel

As is becoming our pattern, Nikki and I decided to take on a major house project this past winter. This time it was the master bathroom. Once again I called on the wealth of knowledge and ability that is my dad, Roger Freitag. We started out wanting to preserve as much of the existing elements and just replace the tile. But as with most projects, once you start the demo, you decide that if you are going to do something, you may as well do it right.

What we ended up doing was a little more than tile, but stopped short of going all the way down to the studs. We did the shower tile, door and fixtures. Also the floor tile, bathtub, toilet, and a couple new mirrors, etc. The bathroom was all that remained original to the 1979 construction of the house, so it was a needed update, and one that we had planned since buying the house in March 2004.

We are set to start remodeling Roger and Kathey’s bathroom on 4.9. They are updating a mid-50’s bath that is long overdue. I’ll post photos once it’s finished.
No comments yet.